Work
Port Aventura Convention Centre
For the construction of the Convention Centre in Port Aventura, 1,500m3 of concrete was applied between floor slabs and paving.
The work was carried out over a period of 6 months from the production centre located in Constantí.
España
Croacia
Turquía
Argentina
México
Colombia
Uruguay
Bolivia
Bangladesh
Túnez