Work
Installations Línia 6 Cementos Molins Industrial
Related families
Concrete
Related products
Related services
Molins was in charge of supplying all the concrete required for the new Cementos Molins production line 6.
The heat exchange tower, with a height of more than 120m, was built by self-forming with continuous slipformed concrete supplied in 24-hour shifts.
It was completed in 2009, making it one of the most efficient cement plants in Europe.
España
Croacia
Turquía
Argentina
México
Colombia
Uruguay
Bolivia
Bangladesh
Túnez