Work
Industrial building – La Pobla de Claramunt
Promsa’s structural team built the structure of this building, which included foundations, tanks and retaining walls.
The structure had insulated footings for the support of prefabricated columns with the Peikko system and the Calyx system.
The tanks were waterproofed and a loading bay was also built.
Walls: 1.200m2.
Concrete: 2,900m3.
España
Croacia
Turquía
Argentina
México
Colombia
Uruguay
Bolivia
Bangladesh
Túnez